Commercial pricing calculator
Estimate a one-time station setup fee and a monthly service bid for an HOA or commercial property.
Adjust pricing, costs and margin +
Planning estimate based on 4.33 weeks per month and your inputs. Each size-factor step adds the configured grounds charge to the per-visit price. The cost check separately shows whether that price meets your target gross margin. At large size factors, validate the assumed minutes per visit on the property before quoting. Review travel, disposal, insurance, overhead, taxes, and site conditions. Sample values are illustrative, not market benchmarks.
Show the setup. Show the service.
When you present a bid to an HOA board or property manager, separate the one-time installation charge from the recurring maintenance charge. It makes the scope and the economics easier to review.
| Fee type | What it covers | Planning approach |
|---|---|---|
| Initial setup fee | Waste station hardware, assembly, mounting materials, and installation labor. | Start with hardware cost, a 30%–50% markup range, and actual installation labor. Adjust for the site. |
| Monthly service fee | Station emptying, bag replenishment, agreed common-area cleanup, and waste disposal. | Estimate direct labor and supplies, then test a 60% gross margin target against the full property scope. |
Protect the hardware investment.
Itemize the initial setup and monthly maintenance charges. If you spread hardware costs into the monthly fee, calculate how long recovery will take and put the term, cancellation terms, and equipment ownership in the written proposal. An early cancellation can otherwise leave the installation unrecovered.
The markup range and margin are editable planning assumptions for this tool, not verified industry benchmarks. Confirm disposal requirements and contract language for the property before submitting a bid.